Mersen

The tower installed at Mersen during April is up and running!

Contractor and owner are both happy with their decision to go with REYMSA.

The FRP cooling tower and all PVC/polymer pipe were selected based on their projected lifespan in a mildly acidic environment, compared with same expectations for galvanized towers and steel pipe.

Custom features:

  • Internal divider wall.
  • Each cell is sized for 75% of current load for redundancy rather than 2 single cell towers.
  • Bottom gravity drain.
  • Bypass inlets for emergency repairs.