Innovative Solutions for Challenging Problems
|
|
|
|
|
|
|
|
|
|
|
|
The Fairmont Orchid Hotel in Kona, Hawaii, now boasts an upgraded cooling system, featuring durable Reymsa Cooling Towers made from FRP to withstand harsh tropical conditions. The enhanced chiller plant offers flexibility by operating with either the existing well system or the newly installed towers, optimizing efficiency based on demand. |
Check out this impressive project at UBC's School of Biomedical Engineering! The HFC closed-circuit fluid cooler is truly remarkable. Big thanks to Clinton Pray from True Mechanical for sharing this! |
The outdated cooling towers, which were replaced with modern, energy-efficient REYMSA units, resulted in enhanced cooling performance and reduced energy costs. Replacing old competitors' cooling towers with REYMSA’s advanced technology has made a significant impact on the building’s overall efficiency. This upgrade not only boosts the building's performance but also supports the company’s commitment to sustainability and long-term environmental goals. Kudos to Applied Climate Solutions for delivering such an outstanding project that advances both operational efficiency and environmental sustainability |
Click this link to watch a video of the replacement in process:
|
This multi-use facility, combining offices, residences, and retail, required a cooling tower upgrade to address ongoing issues with its single-fan metal cooling tower. Located near the coast, corrosion was a significant challenge. Mark A. Zip, from our Rep Johnson Controls, recommended an RTUP Reymsa cooling tower for its corrosion-resistant design, precise fitment, dual-fan configuration, and the added bonus of a sleek gray color. This solution provided enhanced reliability and the redundancy the previous system lacked. ✨ Key Wins: ✅ Improved Redundancy: Dual fans minimize downtime risks. ✅ Energy Efficiency: Lower horsepower means reduced operating costs. ✅ Enhanced Aesthetics: The gray color offers a modern, professional look that complements the facility. This upgrade is a great example of how customized solutions can solve challenges, boost long-term performance, and elevate the visual appeal of the system. Thanks Mike for sharing this amazing project! |